Concrete volume, clearly explained

Concrete Calculator

Calculate concrete volume for slabs, footings, columns and walls. Enter imperial or metric dimensions.

Concrete volume calculator

Preparing the calculator. If controls remain unavailable, reload the page and check that JavaScript is enabled.

Concrete volume calculator
Choose a shape

Pour dimensions

Measurement system

Use decimal values, or choose ft + in. Inch fields also accept fractions such as 3 1/2. Units convert your existing dimensions.

Advanced OptionsWaste: 0% · Quantity: 1
Schematic · not to scaleRectangular Slab

Length · Width · Thickness

A practical measuring guide

How much concrete do I need?

Start with the shape and dimensions of the space you intend to fill. This concrete calculator estimates volume for solid slabs, footings, round columns and walls. It reports cubic yards, cubic feet and cubic meters from the same measurements.

01

Identify the shape

A slab, footing, column or wall needs a different set of measurements. Use solid shapes with a uniform thickness or depth.

02

Measure the dimensions

Record the length, width and thickness, or the diameter and height. Thickness is essential: area alone does not give volume. Choose Imperial or Metric, then select a unit for each dimension. Changing units converts the measurements you already entered.

03

Review the assumptions

Select Calculate Concrete to see the estimate. Advanced Options contains quantity, optional waste and bag estimates. Review the assumptions and confirm project measurements with your supplier. After an input changes, calculate again to update the results.

Understand the geometry

How concrete volume is calculated

Convert dimensions to the same linear unit before multiplying. The result is expressed in the corresponding cubic unit.

Rectangular slab or footing

Volume = length × width × depth

For example, dimensions entered entirely in feet give cubic feet. Divide cubic feet by 27 to express the volume in cubic yards.

Round columns and circular slabs

Use π × (diameter ÷ 2)² × height or thickness. Measure the full diameter across the circle; the radius is half that distance.

Straight, solid walls

Multiply length × height × thickness. Openings, intersecting sections and hollow forms need separate treatment.

Measurements and conversions

Cubic yards, cubic feet and cubic meters

Imperial inputs accept feet, inches, or separate feet and inches. Use decimal feet, or choose ft + in for a measurement such as 8 feet 6 inches. Inch fields also accept fractions such as 3 1/2. Metric inputs use meters or centimeters and decimal values.

A concrete yard estimate means cubic yards, not linear yards or square yards. One cubic yard equals 27 cubic feet. Using the international foot definition, 1 ft³ = 0.028316846592 m³ and 1 yd³ = 0.764554857984 m³. Convert thickness to the same linear unit as the other dimensions before multiplying.

The calculator keeps its internal precision when units change and rounds only the displayed result. Use Copy Result or the expandable Formula breakdown to review the dimensions, quantity and waste assumption.

Check the arithmetic

Concrete slab volume examples

24 ft × 12 ft slab, 4 inches thick

Convert the specified thickness: 4 ÷ 12 = 1/3 ft. Multiply 24 × 12 × 1/3 = 96 ft³. Divide by 27 to get 3.555555… yd³, approximately 3.556 yd³ or 2.718 m³.

If you explicitly select 10% waste, 96 × 1.10 = 105.6 ft³, approximately 3.911 yd³ or 2.990 m³. The 4-inch dimension and 10% allowance illustrate the math; neither is a construction recommendation.

3 m × 2 m slab, 10 cm thick

Convert 10 cm to 0.1 m. Multiply 3 × 2 × 0.1 = 0.6 m³, approximately 21.189 ft³ or 0.785 yd³, before waste.

For three identical sections, set Quantity to 3: 0.6 × 3 = 1.8 m³ net. For sections with different dimensions, calculate each separately and add their volumes. Do not count overlapping concrete twice.

Optional assumptions

Waste allowance and premixed concrete bags

Net volume versus an added allowance

The fresh calculator starts at 0% waste, with quantity 1 and bag estimates off. Advanced Options is collapsed. Enable Add a waste allowance only if you want an additional percentage. Total volume = net volume × (1 + waste percentage ÷ 100). Net volume already includes the quantity of identical sections; the results show net volume and the extra allowance separately when waste is enabled.

Choose an allowance for the actual project conditions with your supplier or project adviser. The calculator does not decide which percentage is appropriate. No universal allowance is silently added.

Estimate bags from the product’s stated yield

Enable Estimate premixed bags, then enter the volume yield per bag from the specific product label and its package size. Bag count = total volume ÷ yield per bag, rounded upward to a whole bag. Bag weight identifies the package; it does not establish its yield.

For example, if your product label states a yield of 0.6 ft³ per bag, 96 ÷ 0.6 = 160 bags for the reference slab before waste. With the illustrative 10% allowance, 105.6 ÷ 0.6 = 176 bags. This is a conditional yield example, not a claim about every bag of a particular weight or brand.

One calculator, five shapes

Supported calculator shapes

Choose the shape that matches your project. All five modes use the same volume calculation engine.

  • Rectangular slab
  • Footing
  • Round footing / column
  • Circular slab
  • Concrete wall

Rectangular Slab: length × width × thickness. Footing: run length × width × depth for a uniform rectangular section. Round Footing / Column: diameter and height/depth. Circular Slab: diameter and thickness. Concrete Wall: length × height × thickness. Round modes use the cylinder formula shown above; diameter is twice the radius.

Common questions

Concrete volume FAQ

Why do I need the thickness or depth?

Length × width describes an area. Multiplying that area by thickness or depth gives a volume. Every slab and footing estimate needs that third dimension; square footage alone cannot determine cubic yards. Use the thickness specified for your project, not a value inferred by the calculator.

What is the difference between cubic feet and cubic yards?

One cubic yard contains 27 cubic feet. Both describe volume; a linear yard is a different measurement. To calculate concrete in cubic yards from cubic feet, divide by 27. The same result is also available in cubic meters; see the unit conversions and worked slab examples.

Will waste allowance be included automatically?

No. The calculator starts with no waste allowance. Any extra percentage is an explicit choice, shown separately from the measured volume. Open Advanced Options to enable it. The waste and bag guidance explains how the total changes.

Can bag weight alone tell me how many bags to buy?

No. A bag estimate needs the product’s stated volume yield. Different products and package sizes can have different yields. The optional bag estimate identifies the user-entered yield assumption and rounds the required number of bags upward.

Calculation assumptions and limitations

Scope of this tool: Concrete volume estimates do not determine safe slab thickness, footing sizes, concrete strength or reinforcement. Use project dimensions supplied by your design or qualified adviser.

The formulas assume solid, uniform rectangular prisms or cylinders. The calculator does not subtract openings, reinforcing steel or intersecting sections, and it does not model slopes, tapered forms or irregular excavation. It estimates volume, not mix proportions, strength, supplier prices or delivery requirements.

Conversion reference: NIST Guide to the SI conversion factors. The exact foot-based volume factors above follow from 1 ft = 0.3048 m. Check the assumptions, then return to the concrete calculator to enter your own measurements.